Our Portfolio

Projects That Power Communities

From gas peaking plants to battery storage and anaerobic digestion, explore our track record of delivering critical energy infrastructure across the UK.

320+

Projects Completed

150km+

Utilities Installed

1.5M+

Safe Working Hours

20+

Years Experience

Gerrards Cross BESS
Energy Case Study
Gerrards Cross

Gerrards Cross BESS

Civils subcontract including drainage, cable trenching, steelwork subframes, lifting operations and fencing for a major battery energy storage system within a live water treatment works.

View Case Study
Crewkerne STOR
Energy
Crewkerne

Crewkerne STOR

Full civil and structural design and build of all foundations for a 7.5MW gas peaking plant on a brownfield site in a busy industrial estate in Crewkerne, Somerset — including site clearance, access road, and balance-of-plant coordination as principal contractor.

View Case Study
Exmouth STOR
Energy
Exmouth

Exmouth STOR

Construction of all foundations for a 7.5MW gas peaking plant on a compact site near Exmouth, Devon — including an access road, acoustic and security fencing, ducting and drainage, delivered through close coordination with the customer and their contractors.

View Case Study
Minehead STOR
Energy
Minehead

Minehead STOR

Full civil and structural design and build of all foundations for a 7.5MW gas peaking plant on a constrained brownfield site in Minehead, Somerset — including an access road, acoustic and security fencing, and piled foundations to 18 metres.

View Case Study
Wootton Bassett STOR
Energy
Royal Wootton Bassett

Wootton Bassett STOR

Full civil and structural design and build of all foundations for a 5MW gas peaking plant on a brownfield site with limited access in Royal Wootton Bassett, Wiltshire — delivered as principal contractor with meticulous delivery planning.

View Case Study
Yeovil STOR
Energy
Yeovil

Yeovil STOR

Full civils design & build for a STOR power generation facility including foundations, access roads, security fencing, ducting, drainage and footpaths on a brownfield site.

View Case Study
Melksham STOR
Energy
Melksham

Melksham STOR

Full civil and structural design and build of all foundations for a 7.5MW gas peaking plant in Melksham, Wiltshire — overcoming contaminated ground, soft clay to 10 metres, asbestos, overhead lines and an adjacent mainline railway.

View Case Study
Langage STOR
Energy
Langage, Plymouth

Langage STOR

Full civils design and build of a 7.5MW gas peaking plant on a greenfield embankment site near Plymouth, Devon — with detailed geotechnical design, all arisings reused on site and 100% of waste recycled.

View Case Study
Valley Road STOR
Energy
Valley Road, Plymouth

Valley Road STOR

Full civil and structural design and build of all foundations for a 7.5MW gas peaking plant on a very compact site in Plymouth, Devon — delivered safely alongside a busy public highway and an active industrial yard.

View Case Study
Wallingford AD
Energy
Wallingford

Wallingford AD

Refurbishment of a 15m-diameter, 4m-high underground primary mixing tank at a food waste anaerobic digestion plant in Oxfordshire — including robotic demolition, concrete repair, structural steelwork and epoxy lining, acting as principal contractor.

View Case Study
Calne STOR
Energy
Calne

Calne STOR

Full civil and structural design and build of the reinforced concrete bases for the generators, radiators, oil tanks and transformers, plus the DNO substation base, on a live haulage yard in Calne, Wiltshire.

View Case Study
Holditch STOR
Energy
Holditch

Holditch STOR

Demolition and construction works for the re-powering of a generation site, replacing 26 diesel generators with 14 gas-powered units, achieving 100% waste recycling.

View Case Study

Have a project in mind?

We'd love to hear about your infrastructure requirements. Get in touch for a free consultation and quote.

Start Your Project