14MW STOR Re-Powering

Demolition and construction works for the re-powering of a generation site, replacing 26 diesel generators with 14 gas-powered units, achieving 100% waste recycling.

Location

Holditch

Completed

2019

Client

GMI Power

Sector

Energy

14MW

Generation Capacity

100%

Waste Recycled

26 → 14

Generator Replacement

Zero

Waste to Landfill

Project Overview

Our works involved the civil and structural design and build of a number of new concrete plinths to support the re-powering of a section of the site from 26 x 500kW diesel generators to 14 x 1MW gas-powered generators.

This significant upgrade increased the site’s generation capacity while transitioning to cleaner gas-powered technology, demonstrating the energy sector’s commitment to reducing environmental impact.

Working Within Constraints

The project presented unique challenges as all works were undertaken within the confines of an existing, operational generation site. This required:

  • Careful coordination with ongoing site operations
  • Phased demolition and construction programme
  • Maintaining safe access throughout the works
  • Minimising disruption to existing infrastructure

Innovative Demolition Approach

We undertook the demolition of 26 reinforced concrete plinths using robotic demolition equipment, providing a safer and more efficient method for working in the confined site conditions.

Conveyor Belt Extraction System

The arisings from the demolition works were extracted using a conveyor belt system, allowing for:

  • Efficient material handling in restricted spaces
  • Reduced vehicle movements on site
  • Improved safety by separating demolition and extraction activities
  • Better control of dust and debris

Sustainable Achievement

100% of waste generated on this project was recycled and processed in the immediate local area.

This outstanding environmental performance reflects our commitment to sustainable construction practices:

  • All concrete was crushed and recycled as aggregate
  • Steel reinforcement was separated and sent for recycling
  • Local processing reduced transport emissions
  • Zero waste sent to landfill

Construction Phase

Following demolition and ground reprofiling, we constructed the new reinforced concrete plinths to support the upgraded gas-powered generators. The new foundations were designed to accommodate the different load characteristics and connection requirements of the 1MW gas units.

Key Achievements

  • Successful demolition of 26 existing concrete plinths
  • Construction of new plinths for 14 x 1MW generators
  • 100% waste recycling achieved
  • Zero incidents throughout the project
  • Minimal disruption to existing site operations
  • Local waste processing supporting the community

Project Gallery

A visual overview of the Holditch STOR project, showcasing our workmanship and attention to detail.

Ready to Start Your Project?

With over 20 years of experience and 320+ successful projects, we're ready to deliver your next infrastructure project safely and efficiently.

Discuss Your Project