Gerrards Cross BESS
Back to Projects
Energy Featured Project

Gerrards Cross BESS

20MW Battery Storage Facility

Civils subcontract including drainage, cable trenching, steelwork subframes, lifting operations and fencing for a major battery energy storage system within a live water treatment works.

Location

Gerrards Cross

Completed

2023

Client

HV Electrical Subcontractor

Sector

Energy

20MW

Battery Storage Capacity

100%

Incident Free Delivery

Live Site

Adjacent to Active Treatment Areas

Multi-Phase

Complex Programme Delivery

Project Overview

As the appointed Civils Subcontractor, Hayward played a pivotal role in this prestigious project, involving the construction of a 20MW battery storage facility within a large water treatment works on behalf of the HV Electrical Subcontractor.

The intricate nature of the work demanded meticulous planning and coordination among various key stakeholders, including the site owner – a major water company. The project required strict adherence to rules and procedures, with compliance to the BESS Principal Contractor’s stringent Quality, Environmental, Health & Safety requirements being essential due to the work being performed adjacent to live treatment areas.

Challenges and Triumphs

The DNO cable route was successfully installed across challenging terrain, overcoming various obstacles. These challenges included:

  • Ecological Concerns – Potential presence of protected species requiring careful site management and coordination with ecological consultants
  • Arboricultural Concerns – Protected trees and root zones necessitating specialist approaches to preserve existing vegetation
  • Operational Constraints – Most of the cable route passed through an easement within the water treatment site and alongside live, often unmapped, assets

Our team worked closely with all stakeholders to navigate these challenges while maintaining project momentum and ensuring full regulatory compliance.

Performance and Execution

Hayward’s team of multi-disciplined, skilled workers operated safely and efficiently to execute a complex work schedule which relied on “just in time” deliveries from multiple suppliers.

Our scope of works included:

  • Offloading, assembly and installation of galvanised steel substructure
  • Supporting infrastructure for batteries, PCS units, transformers and switchroom
  • Receiving, unpacking, orienting, lifting and installing all major equipment
  • Complete cable installation and termination works

All activities were completed incident free – a testament to our unwavering commitment to health and safety excellence.

Adaptability to Changes

The project encountered several design changes throughout its lifecycle, prompting regular planning meetings and rescheduling of key tasks to align with the critical path.

Despite these challenges, the team seamlessly managed the adjustments, providing the client and principal contractor with regular updates through Hayward’s standardised reporting systems. This transparent approach ensured all parties remained informed and aligned throughout the project duration.

Delivering Excellence

The successful completion of this project showcased our commitment to:

  • Excellence – Delivering high-quality civil engineering works to exacting standards
  • Safety – Maintaining an incident-free working environment throughout
  • Adaptability – Responding effectively to design changes and evolving requirements

Our collaborative approach, adherence to high standards and ability to navigate unforeseen challenges highlight our proficiency as a reliable civils subcontractor for complex energy infrastructure projects.

Project Gallery

A visual overview of the Gerrards Cross BESS project, showcasing our workmanship and attention to detail.

Ready to Start Your Project?

With over 20 years of experience and 320+ successful projects, we're ready to deliver your next infrastructure project safely and efficiently.

Discuss Your Project